    排水管道安全施工技能办法
    2018-09-25 17:27:48
    排水管道安全施工技能办法
    Drainage pipeline safety construction skills
    排水管在施工过程中要十分留意的就是施工过程中的安全问题。
    In the process of construction, the safety problems in the construction process are very important.
    1.在土方工程施工中,因为土方具有工程量.施工条件杂乱的特点,安排土石方工程的施工,多选用机械化或半机械化施工,所以在安排施工时更应该做到安全榜首。基坑或管沟需设置支撑时,应依据开挖深度.土质条件.地下水位.施工办法.相邻建筑物和构筑物等状况进行支撑安全规划,支撑有必要结实牢靠,确保安全施工。
    1. In the construction of earthwork, because earthwork has the characteristics of Engineering quantity, disordered construction conditions, the arrangement of earthwork construction, mostly using mechanized or semi-mechanized construction, so in the arrangement of construction should be the top safety list. When the foundation pit or pipe trench needs to be supported, it should be planned according to the excavation depth, soil condition, groundwater level, construction method, adjacent buildings and structures. The support must be strong and reliable to ensure safe construction.
    2.施工现场暂时用电安全,暂时用电有必要遵循J克J46-88《施工现场暂时用电安全技能规范》要求履行。将照明与动力分隔,避免因为机械用电毛病形成照明停电给修理与工作面施工带来不安全因素。
    2. Safety of temporary use of electricity at construction site, it is necessary to comply with JK J46-88 "Code of Safety Skills for Temporary Use of Electricity at Construction Site". Lighting and power will be separated, to avoid mechanical electrical defects caused by lighting blackouts to repair and face construction of unsafe factors.
    3.在挖方边坡上侧堆土或资料以及移动施工机械时,应与挖方边际坚持必定间隔,堆土或资料应距挖方边际5米以外,高度不宜超越1.5米。土方施工前需求做好地上排水和下降地下水位的工作。基槽沿边有必要设三道护身栏杆,榜首道距天然地上0.2米,第二道0.8米,第三道1.5米,并用立网满关闭悬挂警告牌和夜间红灯警示,避免沿边附物附人。开挖后的基土不允许长时期受酷日曝晒或雨水浸泡以保证根底土地耐力力气。
    3. In the excavation slope side of the pile or data and moving construction machinery, should adhere to a certain interval with the excavation margin, pile or data should be 5 meters away from the excavation margin, height should not exceed 1.5 meters. Before the construction of the earth, it is necessary to do well the work of drainage and lowering the water table. It is necessary to set up three guard railings along the base trough. The first road is 0.2 meters away from the natural ground, the second is 0.8 meters, and the third is 1.5 meters. The foundation soil after excavation is not allowed to be exposed to the sun or rain for a long time to ensure the endurance of the underlying soil.
    4.电气防火技能和电气防火安排办法

    4. electrical fire prevention skills and electrical fire prevention arrangements

    济南管道疏通

    合理装备.整定.替换各种维护电器,对电器和设备的过载短路毛病进行牢靠的维护。在电气设备和线路周围禁绝放易燃.易爆和强腐蚀介质.运用火源。在电气设备相对集中的场所,如变电所.配电室.发电机等装备干粉救活器及救活器件等,并制止焰火。加强电气设备相间的仅有地间绝缘。 疏通管道
    Reasonable equipment. Setting. Replacing all kinds of maintenance electrical appliances, electrical and equipment overload short circuit fault for reliable maintenance. Prohibit flammable, explosive and strong corrosive around electrical equipment and lines. Use fire sources. In places where electrical equipment is relatively concentrated, such as substations, distribution rooms, generators and other equipment such as dry powder lifesavers and lifesaving devices, and to stop fireworks. To strengthen interphase insulation between electrical equipment. Dredge pipe
    5.对于易燃物的管理制度。
    5. management system for combustible materials.
    树立易燃.易爆物和腐蚀介质管理制度。树立电气防火责任制,加强电气防火要点场所焰火电器控制,设置制止焰火标志。树立电气防火教育制,常常进行电气防火常识教育和宣扬,进步各类用电人员电气防火自觉性。树立电气防火查看制,发现问题,及时处理。强化电气防火领导体制,树立电气防火部队。
    Establish a management system for flammable, explosive and corrosive . Set up the responsibility system of electric fire prevention, strengthen the control of fireworks and electrical appliances in the key places of electric fire prevention, and set up the sign of stopping fireworks. Establishing the electric fire prevention education system often carries on the electric fire prevention common sense education and the propaganda, advances each kind of electricity personnel electric fire prevention consciousness. Set up an electrical fire prevention system, find problems and deal with them in time. We should strengthen the leading system of electrical fire prevention and set up an electric fire prevention unit.
    6.照明
    6. lighting
    依据运用场所的环境条件挑选相应的照明器;地灯电压不得超越24V,灯具离地上高度不低于2.4米,场所照明电压不大于24V。湿润及易触摸带电体场所照明电压不大于12V。对各类用电人员进行安全用电基本常识训练。
    Choose the appropriate lighting according to the environmental conditions of the site; the voltage of the ground lamp should not exceed 24V, the height of the lamp should not be less than 2.4m from the ground, and the lighting voltage of the place should not exceed 24V. The lighting voltage of wetting and touchable electrified bodies is not greater than 12V. Basic knowledge training for all kinds of power users for safe use of electricity.
    济南圣果管道清运有限公司,对济南管道疏通感兴趣的朋友可以关注我们,敬请期待更多精彩内容
    Jinan Shengguo Pipeline Clearing Co., Ltd. Those interested in Jinan pipeline dredging can pay attention to our , please look forward to more exciting content